SteelCollarRobotics and Aeronautics
Ground JoeAir AmeliaOrbit KatherineGovernments Abe
Home / Industries / Machine shops and job shops

Robots for machine shops and job shops

Ten to two hundred people, CNC lathes and mills, part families that repeat mixed with one-offs that do not, and a second shift you cannot staff. This is where most first robots go in, and where most bad ones get parked.

Free, about two minutes, no phone number. You get an honest no when a robot is the wrong answer.

Who this is for

You run mills or lathes and an operator loads a part, closes the door, and waits. Spindle utilization is lower than it should be. Turnover in the second shift is chronic. You have families of parts that repeat weekly or monthly, even if every job is different.

What automates first here

Machines that usually make the shortlist

Collaborative arms in the 5 to 30 kg class dominate this work, and our matrix holds them from Universal Robots, FANUC, Doosan, ABB, Dobot, Kassow and more than forty other makers with figures checked against the datasheet. The cell is the arm plus a gripper, a part presentation table or drawer, and the machine interface. The arm is the smallest decision; the interface and the part presentation are where cells fail.

Every machine named on this site is in the published matrix with figures checked against the maker's material and no prices, because a price before an engineer has seen the job is a guess.

What has to be true before anyone quotes

When a robot is the wrong answer here

Someone has already done this

Cobot fills the night shift at a 25 to 50 person machine shop

Precision CNC machining, medical device components · Trade press

Toolcraft Inc. of Monroe, Washington won a large medical device order that needed round the clock production, but could not hire for a third shift in a tight labor market. A cobot ...

Two rail mounted cobots tend three CNCs in an optics shop

Precision aluminum machining for optical camera assemblies · Vendor published

WALT Machine Inc., a 25 person US shop, faces a seasonal crunch each spring: roughly 6,000 camera housings due in about two months. Rather than add machines and people, the shop hu...

Robot presents all 96 cavities and cuts shot inspection time by 64 percent

Custom injection molding of tight tolerance diagnostic devices, drug delivery systems and implantables · Trade press

Vision Technical Molding in Manchester, Connecticut runs a 96 cavity medical tool at under 10 second cycles, and qualifying a shot means checking a part from every cavity for dimen...

A 33 person molder checks 200 tiny holes in 3.5 seconds with a robot fed camera

Injection molding of fluoropolymers, PEEK, Torlon and Ultem for medical, energy and aerospace · Trade press

Performance Plastics Ltd. in Cincinnati molds a fluoropolymer medical disposable four to a shot, and each part carries an area with 50 holes of 23 mil diameter separated by 12 mil ...

Common questions

Can a robot load my CNC overnight?

Yes, if your parts run in families that repeat and your machine has an automatic door or can be fitted with one. Lights-out running is where the payback lives, and it is also where the part presentation and the finished-part handling have to be engineered, not improvised.

Do I need a new machine?

Usually not. Most machines from the last fifteen years have or can be given an automatic door and a signal interface. Older machines can be tended with a door opener and a retrofit, at a cost that belongs in the quote.

Who programs it when the part changes?

Your operator, after training, on a collaborative arm with a modern pendant. The honest test before you buy is a timed changeover on a demo unit with your own part: if it takes an hour, plan for an hour.

Tell Joe about your operation

Plain words, no phone number. You get an honest preliminary read, the machines worth a shortlist, and a clear no when a robot is the wrong answer.

Browse the casebook